Case 05 of 12 · Website

SHP Construction & Consulting

A modern site on clean code: fast and responsive, with a focus on completed projects. Hosted on Vercel, images delivered via Cloudinary.

Result
Construction company website: PageSpeed 98, search CTR 14.7%
Timeline
≈ 3 weeks
Delivered
December 2024
Stack & channels
  • HTML/CSS/JS
  • SEO
  • Vercel
  • Cloudinary
On this page05

01About the client

SHP is a full-cycle company: from concept and strategy to construction management and facility operation. Its work covers concrete and roofing, steel structures, engineering systems (HVAC, water supply and sewerage, fire protection, electrical, BMS), plus design, 3D visualisation and construction consulting. Completed sites include Port Baku Walk, Deniz Mall, CASA Baku and Rahat Gourmet Crescent Mall.

02What we did

  • Built the structure around the company’s strongest argument — its project portfolio: dedicated sections for Projects, Services, About, Team, Licences and Certificates, and Clients.
  • Coded the site in plain HTML, CSS and JavaScript, with no CMS or page builder, so pages load fast even with heavy photo galleries.
  • Shipped three language versions: Azerbaijani, Russian and English.
  • Showcased client and partner logos (Pasha Group, AZAL, Marriott International, Ritz Carlton) along with ISO licences and certificates — exactly what settles the trust question for a construction buyer.
  • Connected Cloudinary: project photos are delivered compressed and correctly sized, so galleries never slow the page down.
  • Deployed on Vercel: HTTPS, CDN and instant rollback on updates.
  • Set up the SEO basics — headings, meta tags, sitemap and semantic markup.

03Design and structure

The design was developed together with the client. The leading graphic motif is the polyhedron: it reads as precision, momentum and the ability to handle projects of any complexity — which matches how SHP positions itself.

The palette is deliberately restrained: in construction, trust is earned through a calm presentation and strong photography of completed sites, not decoration. Large images act as proof of experience, while short service descriptions lead to the contacts.

04Timeline and process

About three weeks — from approving the layout to going live, including filling all sections and translating into three languages. Delivered in December 2024.

05How the site performs

Google Search Console and PageSpeed Insights data, August 2026.

performance in PageSpeed Insights (desktop)
98 / 100
Largest Contentful Paint; Cumulative Layout Shift 0.002
1.0 s
search CTR: close to one impression in seven turns into a visit
14.7%
average Google position over three months, against 6.4 over 16 months
5.1
  • Accessibility — 90 out of 100, best practices — 96 out of 100.

Need something similar?

Tell us about the task — we give an estimate and a timeline after a 15‑minute brief.

Discuss a similar project